Unlocking the Locks
Words: Chris Couch // Photos: Alex Kwanten
Okay, show of hands. Who doesn’t have at least a small
pang of anxiety when thinking about going through the locks?
I will admit that after 27 years of dealing with the Ballard Locks, even I get anxious.
However, as a delivery captain, my anxiety is rooted in how long the transit will take. I often pre-position a boat outside the day before my expected departure just to avoid any delays. My record for waiting to navigate the locks is four hours. From those of us who transit for a living to the beginner who has yet to be indoctrinated, there are three things that will make the process smoother and ease some of that anxiety: preparation, preparation, and preparation. As in everything we do, preparation is the key to success. First, a little context.
The Evolution of the Lock
The first known locks were used in China during the Song Dynasty (960 to 1279) A.D. They appeared in Europe in the Netherlands in 1373. Completed in 1825, the 83-boat locks of the Erie Canal were the first pound locks built in the United States. Rising 568 feet from the Hudson River and traversing 363 miles, the Erie Canal today is still an amazing piece of engineering. Along with the Great Lakes, the Mississippi River, and the Intercoastal Waterway, it is part of a system of waterways called “The Great Loop” that enables boaters to circumnavigate the eastern half of the United States. It is the locks that enable these varied waterways to be connected.
Locks allow vessels of all kinds, private and commercial, to navigate from ocean to ocean and lake to lake. They allow vessels to transit up and down rivers and from one river to the next. Whether it is the Panama Canal, the scenic canals and rivers of Europe, the Columbia River, or our own Ballard Locks, the engine that drives all locks is gravity.
Gravity Power
Let’s take the Panama Canal as an example. Completed in 1914 to allow shipping to traverse the 50-mile Isthmus of Panama, the canal itself is 29 miles from one set of locks on the Caribbean side to the other set on the Pacific side. A set of three locks takes the skipper up to Gatun Lake and a set of three locks takes you back down. Gatun Lake is a man-made reservoir created from the damming of the Chagres River. When it was completed, it was the largest man-made reservoir in the world. This reservoir sits 87 feet above sea level and comprises most of the canal. When crossing the lake, the islands that you see while transiting the navigable channel are the tops of hills that make up the foothills leading up to the continental divide. The most famous part of the Panama Canal is the passage cutting through the mountains of the divide, which comprises only about a mile of the entire passage.
The elevated Gatun Lake is the engine that drives the entire operation. Its water flows into the locks, raising ships up lock by lock, and then letting them back down. You can imagine the amount of water used to run two sets of six locks, each 110 feet by 1,050 feet. Now add the newly expanded locks at 160 feet by 1,200 feet and you can imagine the job of managing the water supply. In December of 2015, I transited the Panama Canal for my fifth time. The level of Gatun Lake was a full two feet lower than where it was supposed to be for that time of year. This directly affects the draft of the vessels transiting Gatun Lake. It was August of 2014 that the Canal Authority announced that cargo weight limits may have to be imposed. Shifting climate patterns have caused the wet season to become drier than historical norms, bad news at a time when the canal is expanding its operations.
The Ballard Locks
Just as with the Panama Canal, our own Ballard Locks depends on a large source of water to operate. In the early days of the Pacific Northwest, coal and timber were two of the pillars of our economy. Driven by the need to move coal and timber from the Lake Washington area to Puget Sound as early as 1854, discussion had started about linking the two bodies of water. In 1867 the U.S. Navy pushed that idea along with their desire for a freshwater base and shipyard. The U.S. Army Corp of Engineers would start the planning in 1891 and the funding wouldn’t be secured from Congress until 1902. It was in 1910 when Major Hiram M. Chittenden was given command of the area’s Army Corps of Engineers that the project finally took shape and started in earnest.
The Hiram M. Chittenden Locks, or Ballard Locks as they are more commonly known, were completed in 1917. They were part of a larger Lake Washington Ship Canal project to connect Lake Washington, Lake Union, and Salmon Bay to Puget Sound. This larger project was officially completed in 1934. It is interesting to note that with the opening of the Ship Canal and Locks in 1917, the water level of Lake Washington was lowered almost nine feet. In addition to exposing a lot of new shoreline, it had the effect of reversing the flow of the Black River in Renton. The Black River flowed south from the south end of the lake and, joined by the Carbon River, joined the Duwamish River in Tukwila. Today the Black River does not exist and the Carbon River now flows north into Lake Washington. The Black River to the Duwamish River and then to Elliott Bay was just one of four other routes that were considered as the major Lake Washington to Puget Sound waterway. These other routes were eventually eliminated from contention as either too long or too difficult to construct.
How to Unlock the Ballard Locks
Now that we’ve gotten the historical context out of the way, we can focus on how to get you and your boat through the Ballard Locks. The Ballard Locks consist of two separate locks: a small lock and a large lock. The small lock is 150 feet long by 30 feet wide and is used for vessels approximately 100 feet and smaller. I routinely transit with a 100-foot motoryacht that occupies the entire chamber. The large lock has two separate chambers and when used together is up to 825 feet long by 80 feet wide. The elevation of the lake varies between 20 to 22 feet above sea level. The lowest level occurs during the winter and the highest near the beginning of the summer. The level is high during the summer months to store water in case we have a dry season. There is a dam and spillway next to the locks that regulates the water level and a salmon ladder on the south side of the complex.
For both the big and small locks, when transiting westbound, i.e. from the lake to the Sound, the typical side you will tie up on is your starboard side. When transiting eastbound, or from the Sound to the lake, you will be on your port side most of the time. This is not always the case however, so being prepared for both sides is highly recommended. I cannot stress this enough. Being prepared for the big or small lock and for port or starboard side is very important. You must be prepared for any situation and any contingency.
Preparation for the locks should start taking place well before you arrive. I always start with the fenders. For both the big and small locks, your vessel will be up against either a concrete or steel wall. Fenders should be placed to protect the widest parts of your vessel. I recommend at least three on each side and the largest you have. Most vessels I see are using fenders that should be much bigger. Remember what fenders do. Fenders are there to protect your vessel. The bigger, the better.